WWTP Riedstadt, Germany; Modernisation of activated sludge process

SUCTORIA (Acineta)

Alternative Zone

AIR FLOW RATE CONTROL

PROJEKT INFORMATION

Project management of modernisation measures. The range of services includes among others process and plant engineeirng studies, process engineering optimization studies, longterm investment forecast, design and control of measures, standardization (drawings, plant labeling, documentation), energy analysis.

PROJECT DETAILS

  • Client: Public Services Riedstadt
  • Branch: Municipal WWTP
  • Plant Size: 32.000 PE
Bogota, Colombia
Wastewater/Sludge Treatment, Industry
Astana, Kazahkstan
Wastewater Treatment
Galati, Romania
Wastewater/Sludge Treatment
MBBR Plant Turkey
Waastewater/Sludge Treatment